FOR DEVELOPERS

A stronger application starts before submission.

Landvera completes technical checks across your project documents and requirements, helping your team resolve gaps and document conflicts before submission or resubmission.

Comment matrix for 245 Eglinton, including the reviewed-item summary and resolved review rows.

Regulatory intelligence, applied to your project.

Landvera builds a connected understanding of what is proposed, what needs approval and how the application can advance. That context shapes the scope, applicable jurisdictional standards and technical checks.

01

Your application. A defined scope.

Establish the disciplines, checks and deliverables your application requires so your team knows what to address before the next submission.

245 Eglinton submission check showing the document review summary and verified-document table.
01

Agreed scope

Set out the review disciplines, assigned checks and deliverables with your team.

02

Applicable requirements

Identify the jurisdictional requirements and review criteria relevant to the project.

03

Current submission context

Bring current drawings, reports and prior comments together as the basis for review.

02

Hundreds of checks. One connected application.

Find gaps and conflicts across drawings, reports and requirements, including changes that affect work in another discipline.

Sanitary servicing report alongside the Landvera project assistant, with a cited sewer design criterion and technical-review reasoning.
01

Geometric analysis

Check dimensions, areas, setbacks and spatial relationships shown across submitted drawings.

02

Requirements checks

Assess project details against applicable requirements and the agreed review criteria.

03

Cross-discipline dependencies

Trace shared assumptions and document connections that may affect another discipline.

03

Clear findings. Evidence attached.

Give your consultants actionable findings linked to drawing references, report passages and applicable requirements so they can assess the issue and respond with supporting evidence.

Cited sewer design criteria and calculation table with an open source tooltip showing the document title, revision, retrieval date and source control.
01

Source-linked findings

Connect each issue to the drawing, report passage or requirement behind it.

02

Clear ownership and comments

Make the requested response and issue ownership clear to the people coordinating revisions.

03

Exceptions for professional judgment

Identify judgment-dependent conclusions for assessment by qualified professionals.

04

Revisions checked. Resolutions verified.

Check updated drawings and reports against earlier findings, trace the effects of revisions and identify what still needs attention before resubmission.

Current site-plan revision with red change annotations and review, revision and drawing decision controls.
01

Version comparison

Compare revised drawings and reports with the materials reviewed in the previous round.

02

Resolution verification

Recheck responses against earlier findings and make unresolved issues visible.

03

Application history

Keep changes, evidence and responses traceable across review rounds.

05

Aligned consultants. Faster progress.

Landvera keeps your consultants aligned and your next submission on track. It coordinates responsibilities, deadlines and dependencies across disciplines to resolve blockers sooner and eliminate costly downstream review cycles.

Architecture coordination panel assigning 96 items to an owner and due date, retaining earlier City deadlines and highlighting nine shared Civil dependencies.
01

Consultant coordination

Connect shared issues across architecture, engineering and other disciplines so changes are addressed together.

02

Clear accountability

Give each action an owner and due date, with shared responsibilities visible to everyone involved.

03

Submission priorities

Identify the inputs and decisions needed next so unresolved dependencies do not delay submission or trigger another review cycle.

Technical findings. Professional judgment.

Your qualified professionals assess the evidence, resolve exceptions and retain required sign-off. Landvera completes the technical analysis that supports their work; approval decisions remain with the relevant authorities.

Traceable evidence. Accountable decisions.

Two professionals review a development plan together, with one pointing to a drawing on screen as the other makes notes on a tablet.

Technical work across the approval lifecycle.

Prepare the documents and evidence your next approval stage needs, from planning amendments to building permits.

Coordinate the planning rationale, policy assessment and supporting studies; organize source-linked findings your team and consultants can assess as the amendment package develops.

Planning-rationale source excerpt with a highlighted passage, document identity, page number and open-source button.

Approval names and review scope vary by project and jurisdiction. Document review does not replace physical inspections, required professional certification or statutory approval.

Fewer comments. Faster approvals.

Help your consultants resolve preventable issues before submission and eliminate costly downstream review cycles.

  1. 2×Potential reviewer capacityCapacity estimated from licensed professional time saved.
  2. 50%Of avoidable comments eliminated
  3. 50+Average hours saved per development manager, per month